top of page
Works Gallery Of installations
Our Teams Oil Boiler installations
Worcester heatslave 2 external | ||
---|---|---|
new oil boiler and oil tank install | Worcester heatslave 2 external | |
Worcester heatslave 2 combi boiler with external pipework with weatherproof Insulated | Worcester heatslave 2 external | |
New boiler complete, 3 Zone system | ||
All boilers fitted with system filters | Worcester heatslave 2 all boilers fitted with system filters | Worcester heatslave 2 |
Worcester heatslave 2 | system boiler with unvented cylinder | |
Worcester heatslave 2 external | Plume management system fitted as condesing plume could be a nuisance to neighbours | |
plume management system | Polyoil 1200lt Oil tank | |
Insufficient oil tank base.Typical uneven unsupportive base, | start of oil tank base | wacca plating oil tank base |
oil tank base now filled | base now finished with new oil tank | oil tank base |
oil tank base with paving slabs | Cracked oil tank due to uneven Insufficient base | |
Tank complete, 650lt carbery bunded oil tank | 1200lt polyoiltank with fire protection against wooden boundary | vertical radiator |
Pipework within Talon boxing | thermostatic valve | |
Digging in the oil line | New tank base | Another tank complete |
Tank complete, 650lt carbery bunded oil tank | 4" of crusher, cement based hardcore | |
Bracing for oil line | 1000lt buded harlequin with 30 minutes fire protection from wooden fence within 760mm, in the form of waterproof cement boards | |
Transfering oil from old tank to new before diposing of tank and base | New tank, transfering of oil from old tank | oil transfer |
2" concrete slab base on minimum of 4" compressed hardcore blinded of with sharp sand | Compressing base | |
Support bracing for oil line | Base complete with Harlequin 1400lt bunded tank | |
Side veiw of new tank and base | ||
Bunded 1300lt harlequin ITE tank | Fire protection board used as wooden fence is within 760mm | |
plume management and white condense pipe also oilline with deareator and fire valve/red filter | Polyoil 1200lt bunded tank | |
1100lt harlequin bunded oil tank | oil tank base close up photo | |
pressure reducing valve and inline lime scale prevention | Slab finnish with buried oil line | |
compacting crucher hardcore before blinding off with sharp sand and laying slabs | ||
combi deareator and filter | ||
2000lt harlequin ITE bunded tank with fire protection | ||
powerflushing local church | Plastic coated oil line within conduit and dug into a 500mm trench with oil line warning tape just below surface | Bottom take off. Sat on compacted hardcore and finished off with 2" concrete paving slabs. |
Oil line within conduit and brought up through base for protection | Complete first and second fix of plumbing including central heated underfloor heating, unvented cylinder and oil fired central heating all controlled through RF wireless system | |
All pipework yet to be insulated | Frisney, new build. | Frisney, new build. |
Frisney, new build. | Gravity fed hot water with pumped central heating. Heat bleed radiator can be seen bottom right of picture. | |
bottom of page