Works Gallery Of installations
Our Teams Oil Boiler installations
 Worcester heatslave 2 external |  |  |
---|
 |  new oil boiler and oil tank install |  Worcester heatslave 2 external |
---|
 |  |  |
---|
 |  Worcester heatslave 2 combi boiler with external pipework with weatherproof Insulated |  Worcester heatslave 2 external |
---|
 New boiler complete, 3 Zone system |  |  |
---|
 All boilers fitted with system filters |  Worcester heatslave 2
all boilers fitted with system filters |  Worcester heatslave 2 |
---|
 Worcester heatslave 2 |  system boiler with unvented cylinder |  |
---|
 |  Worcester heatslave 2 external |  Plume management system fitted as condesing plume could be a nuisance to neighbours |
---|
 plume management system |  |  Polyoil 1200lt Oil tank |
---|
 Insufficient oil tank base.Typical uneven unsupportive base, |  start of oil tank base |  wacca plating oil tank base |
---|
 oil tank base now filled |  base now finished with new oil tank |  oil tank base |
---|
 oil tank base with paving slabs |  |  Cracked oil tank due to uneven Insufficient base |
---|
 Tank complete, 650lt carbery bunded oil tank |  1200lt polyoiltank with fire protection against wooden boundary |  vertical radiator |
---|
 |  Pipework within Talon boxing |  thermostatic valve |
---|
 Digging in the oil line |  New tank base |  Another tank complete |
---|
 Tank complete, 650lt carbery bunded oil tank |  4" of crusher, cement based hardcore |  |
---|
 Bracing for oil line |  1000lt buded harlequin with 30 minutes fire protection from wooden fence within 760mm, in the form of waterproof cement boards |  |
---|
 Transfering oil from old tank to new before diposing of tank and base |  New tank, transfering of oil from old tank |  oil transfer |
---|
 2" concrete slab base on minimum of 4" compressed hardcore blinded of with sharp sand |  Compressing base |  |
---|
 Support bracing for oil line |  |  Base complete with Harlequin 1400lt bunded tank |
---|
 Side veiw of new tank and base |  |  |
---|
 |  Bunded 1300lt harlequin ITE tank |  Fire protection board used as wooden fence is within 760mm |
---|
 plume management and white condense pipe also oilline with deareator and fire valve/red filter |  Polyoil 1200lt bunded tank |  |
---|
 |  1100lt harlequin bunded oil tank |  oil tank base close up photo |
---|
 |  pressure reducing valve and inline lime scale prevention |  Slab finnish with buried oil line |
---|
 compacting crucher hardcore before blinding off with sharp sand and laying slabs |  |  |
---|
 |  |  combi deareator and filter |
---|
 |  2000lt harlequin ITE bunded tank with fire protection |  |
---|
 powerflushing local church |  Plastic coated oil line within conduit and dug into a 500mm trench with oil line warning tape just below surface |  Bottom take off. Sat on compacted hardcore and finished off with 2" concrete paving slabs. |
---|
 Oil line within conduit and brought up through base for protection |  Complete first and second fix of plumbing including central heated underfloor heating, unvented cylinder and oil fired central heating all controlled through RF wireless system |  |
---|
 All pipework yet to be insulated |  Frisney, new build. |  Frisney, new build. |
---|
 Frisney, new build. |  Gravity fed hot water with pumped central heating. Heat bleed radiator can be seen bottom right of picture. |  |
---|
 |  |  |
---|
 |  |  |
---|
 |  |  |
---|
 |
---|